
LAST CALL FOR THE WEST TEXAS EXPRESS!
If you ever dreamed of planting your Flagship 7+GW Data Center within direct line of sight of Blue Origin Launch Site One: here is your chance!
The Crown Jewel of Wildhorse Valley--The only logical tract in the entire county for a 7+GW hyperscale campus
With the perfect topographic features of this farm you could spot a competitor an 18-month head start on any other dirt in Culberson County and still energize your flagship campus first.
Approximately 5,260 all contiguous acres. Approximately 13,750 Acre Feet of Senior Adjudicated Agricultural Water Rights on top of stable aquifer, 900+ feet of saturated thickness sweetwater at 70f water temperature year around. Behind-the-meter Gas EntitlementsWildhorse Valley -- Culberson County, TexasEntertaining Direct Lease Offers ONLY from Principal HyperscalersStructured with a Minimum Annual Guarantee + Per-MW Capacity Kicker(amid active multi-gigawatt land assembly across Culberson County, this direct-owner offering represents the last unemcumbered valley-floor bottleneck. Full-buildout outright purchase proposals also considered. No brokers, land aggregators, or unpaid exclusivity periods, period.)
Site Infrastructure & Bottleneck Summary
Asset / Specification Verified Site CapabilityContiguous Land FootprintApproximately 5,260 contiguous acres (approximately 4,660 net buildable upland acres + approximately 600 acres along Wildhorse Draw, where slow-moving water occasionally backs up and can be largely reclaimed with standard levee and detention work) — built to support a 7+ GW multi-phase campus.7+ GW Power & Scale PathwayUnconstrained footprint engineered for 7+ GW of modular AI compute by stacking behind-the-meter natural gas (West Texas Express + Waha bridge), dedicated high-voltage tie-ins from off-site desert solar/wind, and next-generation Small Modular Reactors (SMRs) — backed by 100+ miles of downwind desert air-dispersion headroom to the north.Flood Protection & LeveeProtected by a 1950s U.S. Army Corps of Engineers flood-control levee and engineered drainage channels located around—not within—the property perimeter (zero widespread valley flooding since construction).Topography & SoilsFlat, uniform approximately 0.3% slope; non-blowing Class 2 silty clay (Verhalen/Michigan/Antbed soils) built for heavy civil pads with minimal dirt work.Groundwater, Recharge & Water ChemistryApproximately 14,000 acre-feet of senior adjudicated agricultural water rights (I actually don't know exactly how many acre-feet it is, but it's a shit ton!) of reliable sweet to slightly saline water from a stable aquifer fed by excellent natural recharge through gypsum sinkholes in the surrounding hills. Backed by an existing hydrological study showing 1,000+ feet of saturated thickness, established approximately 1,500 GPM wells, and approximately 70°F groundwater temperatures year-round. (Full disclosure for cooling engineers: sweetwater profile carries naturally elevated sulfates from the gypsum recharge zone—ideal for closed-loop liquid cooling and standard reverse-osmosis/scale treatment). Water quality varies by depth: the deeper you go, the sweeter it gets!Natural Gas CorridorExisting on-site gas line and priority interconnect access (Waha Hub pricing bridge) positioned in the regional corridor to catch the West Texas Express via a straightforward lateral tie-in (targeting 2029 in-service).Fiber, Rail & Interstate ProximityLocated approximately 6 miles due north of Union Pacific rail, Interstate 10, and the I-10 long-haul fiberoptic corridor — fast, straight-line tie-in to transcontinental dark fiber and heavy freight without highway frontage exposure.Active TCEQ Air Filings(PENDING) at the terminus of FM 2809 for immediate bridge energization.Access, Privacy & SetbacksDirect dead-end FM 2809 blacktop frontage — paved heavy-haul highway access terminating directly at the tract with zero through-traffic, tucked privately behind a local pecan orchard for natural visual screening and single-gate perimeter security. Positioned far enough north of Van Horn, the airport, and I-10 (approximately 6 miles) to run 24/7 heavy construction and multi-GW power generation without risking TCEQ receptor/dispersion delays, airport airspace conflicts, or interstate dust/traffic pileups — yet close enough for an easy approximately 15-minute blacktop commute for shift crews. With prevailing southerly winds blowing north across more than 100 miles of open country before reaching the next town (Carlsbad, NM), the site offers virtually unlimited air-dispersion headroom and zero future urban encroachment.Local Permitting ClimateBusiness-friendly county jurisdiction — Culberson County is pro-development, welcomes large-scale industrial investment, and is notably lacking in CAVE people (Citizens Against Virtually Everything).
Technical downloads below
Approximate boundaries. Soil Survey Report. Hydrological studies

approximate boundaries
https://earth.google.com/earth/d/1R1lR9jwKdTLBqlUsloKmFvTDT-RscmQ?usp=drivelink
custom soil resource report
https://drive.google.com/file/d/1Jp8PGypu3ru7-qxBy-b-j8D1DjEraG5y/view?usp=drive_link
Hydrological Report
https://drive.google.com/file/d/18eh6yfVoNWdyvlym67oAMxWeVjEFEHrV/view?usp=drive_link
saturated thickness map
https://drive.google.com/file/d/14f8UtsdooSualjgKVgy1UqluNGzAvb0l/view?usp=drive_link
Direct Principal Inquiries
Contact: Robert Williams, MD/OwnerMailing Address: 150 Settlement Dr; Suite D
Bastrop, TX 78602Telephone: Office: 866-972-9786Email: [email protected]Disclaimer: This property is independently owned and operated. "Sell Compute on the West Texas Express" is an assumed business name referring to the property's geographic proximity to the proposed West Texas Express pipeline corridor and is not affiliated with, endorsed by, or sponsored by Enbridge Inc. or Blue Origin. All acreages, water volumes, flow rates, distances, and technical figures are approximate and subject to buyer verification during due diligence.